FULL-DEPTH RECLAMATION (FDR) using cement

FULL-DEPTH RECLAMATION (FDR) using cement

 
Rehabilitating an old pavement by pulverizing and stabilizing the existing pavement is a process referred to as Full Depth Reclamation (FDR). This process shows great potential as an economical rehabilitation alternative that provides deep structural benefit, conserves highway
Construction raw materials, and quickly returns the section to service. The stabilized layer
becomes either the base or sub-base of the new pavement structure. the procedures using specialist plant to pulverize and stabilize existing road materials, in-place, at ambient temperature with the addition of cement in dry or slurry condition. The final mix will compact and re-shape for the capping. The cement content shall be selected based on compressive strength as well material specs.